Probabilistic Scheduling
Monte Carlo Critical Path
Rather than a single deterministic critical path, SpaceLean runs 1,000 schedule simulations on every save. Each task gets a criticality probability, zone congestion penalty, and crew bottleneck score — surfacing future critical tasks days before traditional CPM would.
1,000 Monte Carlo simulations on every schedule save
Criticality probability per task — not just binary critical/not
Zone congestion and penetration penalties baked in to each run
Crew bottleneck scoring detects resource-driven slippage early
Network centrality via Neo4j identifies structural risk nodes
Monte Carlo Simulation
1,000 runs · CP-SAT model
Re-runView Report
P50
89d
P80
97d
P95
104d
T1292%Critical
T1871%High
T2563%At-Risk
T0841%Watch
T3118%Safe
Measurable impact
Outcomes that move the schedule.
1,000
Simulations per save
94%
Delay prediction accuracy
7-day
Average forecast lead time
GNN
Neural network critical path