Core Capabilities

Seven pillars of scheduling intelligence.

Working in harmony.Built for how construction actually works.

Construction Board

Sprint 4 · Zone B

Filter+ Add Task
Planned
3
Pour Slab L3
Structural4d
Core Wall Lift
Civil2d
MEP Rough-in
MEP3d
In Progress
2
Install Duct B2
HVAC1d
Frame Walls L2
Structural2d
Done
2
Slab L1
Structural
Columns L1
Civil
Task Management

Kanban Board System

Explore

BIM Model Viewer

Structural · Level 2

Clash CheckSelect ZoneExport
IfcSlab · L2 · Zone-B48.2 m³ · 2 penetrationsCLASH

Properties

TypeIfcSlab
ZoneB
Volume48.2 m³
BIM Intelligence

BIM Element Selection

Explore

AI Task Generator

Auto-detects predecessors from geometry

ImportPush to Schedule
Describe the work in natural language…
Generate →
TaskDurPredecessorTradeConf
Install Pipe P12 · L3 Zone-A2dSlab L3Plumbing94%
HVAC Duct Rough-in · B23dFrame WallsHVAC87%
Electrical Conduit · Core1dCore WallElectrical91%

✦ 12 predecessors auto-detected from geometry

AI Planning

Task Adding & Management

Explore

Risk Monitor

Live · Updated 2 min ago

● LiveExport ReportMitigate
Slab Pour Z3
Critical92%

Zone congestion + crew conflict

MEP Shaft L4
High71%

Material lead time risk

Curtain Wall N
Medium48%

Weather window closing

Fireproofing B2
Low22%

Low — all clear

Predictive Intelligence

Risk Analysis

Explore

AI Sequence Optimizer

Neo4j CKG · OR-Tools CP-SAT

RegenerateApply Sequence

3 sequences generated — select one to apply to master schedule

Option A · Fast-track
84d
Risk: High
Option B · Low-riskRecommended
93d
Risk: Low
Option C · Takt flow
89d
Risk: Medium
Construction Intelligence

AI Sequencing Engine

Explore

Monte Carlo Simulation

1,000 runs · CP-SAT model

Re-runView Report

P50

89d

P80

97d

P95

104d

T12Slab Pour Z3
92%Critical
T18MEP Shaft L4
71%High
T25Curtain Wall N
63%At-Risk
T08Core Lift B3
41%Watch
T31Fireproofing
18%Safe
Probabilistic Scheduling

Monte Carlo Critical Path

Explore
Space Lean vs Traditional Planning

What changes when scheduling is AI-native.

Less manual effort. More predictability.Built to handle real construction dependencies.

Capability

Space Lean

Traditional

Automatic BIM mapping

AI sequence planning

Predictive risk scoring

Auto-replanning on delay

Monte Carlo simulation

Trade dependency analysis

Manual task linking

Days to create schedule

Who Benefits Most

Built for teams that demand more.

Better visibility, faster planning,and schedules that adapt.

Complex Multi-Trade Projects

Large projects with 20+ trades. Space Lean automatically manages interdependencies that would take weeks to manually sequence.

High-Risk Timelines

When delays cost millions. Predictive risk and auto-replanning keep schedules realistic and achievable.

Optimization-Driven Teams

Organizations seeking competitive advantage through AI-driven scheduling and resource efficiency.

Digital-First Contractors

Firms already using Revit/BIM who want to extract maximum value from their digital models.